View Single Post
Old
07-15-2011, 06:46 AM
  #93
TakeThatTootoo
Gare's "Partner"
 
TakeThatTootoo's Avatar
 
Join Date: May 2006
Location: Rochester, NY
Country: United States
Posts: 3,933
vCash: 500
Quote:
Originally Posted by Sabretip View Post
From the look of it, they'll probably have drywall installed in another 2 weeks, afterwhich a lot of the painting and floor finishes would start appearing. I didn't see much new ductwork or mechanical / lighting in place yet, which must be happening very soon.

Still, if mid-September is the goal for completion, it looks about right for where they are now in mid-July.
To tell the truth, when Darcy smacked a hole in the wall...I thought to myself, oh noes this won't be done in time.

TakeThatTootoo is offline   Reply With Quote