View Single Post
Old
01-08-2014, 03:57 AM
  #773
Kodiak64
Registered User
 
Kodiak64's Avatar
 
Join Date: Dec 2010
Location: Edmonton
Country: Canada
Posts: 56
vCash: 500
AFAIK it's the entire lot.

The Baccarat is remaining open during the construction of the arena complex, there will be no work done to the current building (tear down) until after the new location is open (allegedly concurrent with the arena) probably closer to 36 months than 18.

Again I don't have a crystal ball and you are probably right about 5 weeks being too soon. But thats what I was told so thats what I posted.


Last edited by Kodiak64: 01-08-2014 at 04:04 AM.
Kodiak64 is offline